The phases of an architecture project, from idea to construction
Anyone building for the first time tends to ask the same thing: what happens after I hire an architect? A project moves through six phases. Some are optional, and you can hire the whole process or just the phase you need. This is how we explain them at the studio.

Phase I. Preliminary design
It starts with a study of the lot: its shape, slope, sun, wind, views and what land use and setbacks allow. From that we produce the concept design and schematic design: furnished plans, elevations, a roof plan and a site design. You decide whether the design answers how you want to live or work. The phase ends with your written approval, and it is the best moment to change your mind, because doing so later costs much more.
Phase II. Construction drawings
From the approved schematic design come the drawings used to build: architectural, interior architecture, structural, mechanical and electrical, with technical specifications, in Spanish and in the metric system. They are what a contractor uses to bid and build, and what is submitted for the permit. The more complete they are, the less improvisation and the fewer extras during construction.
Phase III. Detailed budget optional
Once the drawings are ready, the work is quantified and a detailed budget is prepared. It is the basis for comparing contractors' bids with the same criteria, and for knowing in time whether the project fits what you want to invest.
Phase IV. Tender and negotiation optional
Several contractors are invited under the same rules for everyone. A technical analysis of the bids follows, and a written report is delivered so you can choose with information. The lowest price is not always the best offer: the analysis also reviews what each one includes.
Phase V. Building permits optional
We coordinate the process with an outside consultant before SETENA, the APC system (CFIA, INVU and the Ministry of Health), AyA, the Fire Department and the municipality. To see which institution takes part and in what order, read Building permits in Costa Rica: who does what.
Phase VI. Construction inspection
During construction we visit the site every week. We approve materials and equipment, control extras and, at the end, prepare the punch list for project handover. It is what ensures that what is built is what was designed.
Which phases you need
- You will build and want full support: phases I to VI.
- You already have a contractor you trust: phases I, II and VI are often enough.
- You do not have a lot yet: before phase I, read what to check before buying a lot.
This guide is general. The scope of each phase is defined in writing in each project's services contract.